
Breakwater completed for Fairmount in 2017

Oyster's farm for EAD 2018

Driving piles using a crane and Vibro hammer

U-shaped Marina done for Sheikh Saif Bin Zayed in 2014

fabrtication & installtation crablock forAbdullah Masood 2015

Relocation of Marina for Tristar in 2019

Design, fabricate and Install a Marina at Abdullah Mater Al Mansoori 2021

Removal of Collapsed Mooring Piles ADFCS 2022

Dredging and Rip Rap Installation at Agility Engineering L.L.C at 2022

Marina Maintenance Emirates Heritage Club 2022

Breakwater Installation at Saadiyat Beach 2021

Design, Supply and Install Marina and Slipway at Hamoodah Sons Holding 2021

Replacement of Defective Bollards at Mina Zayed Port

SUPPLY AND INSTALLATION OF MOORING PILES AT ESNAD BASE 2023

Refurbishing of Piles at Abu Dhabi International Marine Sports Club 2019

DREDGING AND SLOPE AT THE SITE OF ABU DHABI FISH COOPERATIVE SOCIETY 2023

PILING WORKS AT ABU DHABI FISH COOPERATIVE SOCIETY 2023

REVETMENT OF ABU DHABI FISH COOPERATIVE SOCIETY 2023

FABRICATION AND INSTALLATION OF GANGWAY AT ABU DHABI FISH COOPERATIVE SOCIETY 2023

PILING WORKS AT ABU DHABI FISH COOPERATIVE SOCIETY 2023

INSTALLATION OF FINGERS OF THE MARINA WITH THE PILES OF ABU DHABI FISH COOPERATIVE SOCIETY 2023

FINISHED GANGWAY AT ABU DHABI FISH COOPERATIVE SOCIETY 2023

SUPPLY AND INSTALLATION OF MOORING PILES AT ESNAD BASE 2023

FABRICATION AND INSTALLATION OF GANGWAY AT ABU DHABI FISH COOPERATIVE SOCIETY 2023

FINISHED GANGWAY AT ABU DHABI FISH COOPERATIVE SOCIETY 2023

SUPPLY AND INSTALLATION OF MOORING PILES AT ESNAD BASE 2023